Jos. Schmitt & Sons was hired to provide preconstruction services for the design phase for Polyfab’s new manufacturing addition.
Construction began in September of 2014 and finished in September of 2015. The new 57,600 sf addition for manufacturing (injection plastic molding process) included offices, breakrooms, bathrooms and a storage area.
The addition was built with a steel frame with exterior insulated precast panels, polished concrete floors in manufacturing area, interior masonry and steel panel walls.