Construction of the new pre-engineered steel coil storage facility for Charter Steel required complex logistical coordination and technical precision. Building foundations were constructed in phases to maintain an active trucking road through the center of the site, ensuring zero downtime for plant operations. Jos. Schmitt Construction delivered the primary storage area alongside integrated offices and locker rooms.
The scope included extensive site work—including mass excavation and the rerouting of heavy-traffic roads—all executed on an aggressive schedule. This build showcases our firm’s ability to manage heavy industrial projects and complex transit logistics without disrupting the vital movement of materials.