3 Issues That Can Derail A Commercial Construction Project

Over the 125 years that we have been in business, we have seen it all. It is a common talking point that construction projects seem to, more often than not, not finish on time. The truth is, that there are a lot of moving parts, people to coordinate, and projects that rely on one another that push original timelines back.

Most of these items can be resolved easily and a project can quickly get back on track once addressed, however, there are some things that are much more difficult to account for. The difference between Jos. Schmitt Construction and others are that we take extra steps to avoid these 3 factors from negatively impacting any project.

Breaking Budget

Going over budget for a commercial construction project can turn into a big headache in several ways. It negatively affects the involved stakeholders, the client, and the timeline of a building project. If you break the budget on a project it is important to identify the reason(s) why.

Possible reasons for an overrun budget could be linked to incorrect estimates, unforeseen changes to the project scope, and unanticipated material costs. The best way to avoid breaking your budget is to conduct regular resource audits and closely track project progress. That, in combination with clear and constant communication, makes sure that budging questions aren’t preventing a project from moving forward.

Injuries or Accidents

personal safety equipment

When an injury or accident occurs during a building project that puts worker safety, project timelines, and general costs at risk. Accidents can happen at any time so it is important to be aware of that possibility. Most of the time they tend to stem from improper training, hazardous working environments, or faulty safety equipment.

To limit the chances of accidents we have a safety program that is continuously reviewed and updated. While we cannot 100% prevent accidents from occurring, our team is prepared to minimize risks as much as possible.

Man Power and Material Shortages

Shortages in manpower and materials can pose a challenge to your project as a whole. Whether it’s a nationwide shortage of material or a delayed delivery, supply chain shortages are a part of the construction industry. They can be caused by events such as bad weather, labor disputes, and global politics.

You must have a plan in place for shortages that helps you minimize project delays and other associated issues. Diversifying your subcontractor and supplier network can help mitigate the challenges that come with these shortages and prevent them from happening before they even start.

These three building challenges aren’t the only things that can cause problems for a commercial construction project. However, they are important things to consider when planning your next project. Our 125 years of experience have shown us how to prepare for any and all challenges, which means our projects are more likely to stay on track and be completed on the timelines that we promised.